The Verizon schedule (application filed August 10, 2026; auto-grant date September 26, 2026, set by an August 26, 2026 public notice) is consistent with the uniform 31-day automatic grant period being applied to a dominant carrier by August 2026, despite the FR listing the 63.71 amendment as delayed.

inferred · Checked 2026-10-02

Vendor
Verizon
Product
not restricted
Subsystem
section-214-discontinuance
Deployment
carrier-network
Region
us
Release range
as of 2026-09-25
Status
inferred
Checked
2026-10-02

Sources

Cite this note

APA

WarmTransfer. (2026, October 2). POTS line replacement and copper retirement: source note pots-line-replacement-verizon-pn-31-day-timing. WarmTransfer. https://warmtransfer.net/knowledge/claims/pots-line-replacement-verizon-pn-31-day-timing

BibTeX

@misc{warmtransfer-claim-pots-line-replacement-verizon-pn-31-day-timing,
  title  = {POTS line replacement and copper retirement: source note pots-line-replacement-verizon-pn-31-day-timing},
  author = {{WarmTransfer}},
  year   = {2026},
  url    = {https://warmtransfer.net/knowledge/claims/pots-line-replacement-verizon-pn-31-day-timing},
  note   = {Source note pots-line-replacement-verizon-pn-31-day-timing, checked 2026-10-02}
}

Read in context