The square-root safety staffing rule, which descends from Erlang C, staffs above the nominal load (arrival rate over service rate) by a safety margin proportional to the square root of the arrival rate in order to meet a delay-probability target.

Checked 2026-09-25

Vendor
vendor-neutral
Product
not restricted
Subsystem
agent staffing
Deployment
any
Region
not restricted
Release range
arXiv v3 2026-04-23
Checked
2026-09-25

Sources

Cite this note

APA

WarmTransfer. (2026, September 25). Erlang B and Erlang C for voice and contact center sizing: source note erlang-traffic-engineering-square-root-safety. WarmTransfer. https://warmtransfer.net/knowledge/claims/erlang-traffic-engineering-square-root-safety

BibTeX

@misc{warmtransfer-claim-erlang-traffic-engineering-square-root-safety,
  title  = {Erlang B and Erlang C for voice and contact center sizing: source note erlang-traffic-engineering-square-root-safety},
  author = {{WarmTransfer}},
  year   = {2026},
  url    = {https://warmtransfer.net/knowledge/claims/erlang-traffic-engineering-square-root-safety},
  note   = {Source note erlang-traffic-engineering-square-root-safety, checked 2026-09-25}
}

Read in context